Saturday, October 9, 2010

Friday: Gravel and concrete (10/8/10)

On Friday, they dumped several loads of gravel into the crawlspace that will be under the new dining room....



And then leveled it out.


And this is the end result.

Then, the concrete truck came, and they poured the new carport pad...


Then they poured the footing piers along the front...



...and the footing piers along the 'back door' side.


I realized later that they had removed more of the driveway and leveled it out.  This is our lovely path between the basement stairwell and the remaining paved driveway.